This
hCalendar-compliant page
is optimized for search engines. View this calendar as published at
mn.gov.
Lake Charlotte Solar - Public Hearing - Online Hearing via WebEx
EIP Calendar of events
Join by WebEx (Webinar) Link: https://minnesota.webex.com, Webinar Number: 2494 406 6452
Webinar Password: MNPUC (66782 when dialing from a phone or video system)
Join by Phone: 1-855-282-6330 Toll Free Access Code: 2494 406 6452.
Event Type: Public Hearings. Industry: Electric. Solar. Energy Facilities. Docket Number/s: 25-205, 25-206. In the Matter of: In the Matter of Lake Charlotte Solar, LLC’s joint application for the Lake Charlotte 150-MW
Solar Facility and 150-MW Lake Charlotte Battery Energy Storage System (BESS) located in
Rutland Township, Martin County, Minnesota. Follow This Issue: Search eDockets. Subscribe to eDockets.
Tuesday, September 2, 2025, 6:00 PM – 9:00 PM.
For more info visit minnesota.webex.com.
Benton Solar - Public Comment Period Ends
EIP Calendar of events
Written comments will be accepted through September 12, by 4:30 p.m.
Please include the docket number in all communications. Comments received after the close of the comment
period may or may not be considered by the Commission.
Topics for Comment
Should the Commission grant site permits for the proposed solar energy generating
system and the battery energy storage system?
Should the Commission issue a route permit for the transmission line associated with the
solar and battery energy storage project?
If granted, what additional conditions or requirements should be included in the site
permits and/or in the route permit?
Event Type: Public Hearings. Industry: Energy Facilities. Solar. Other. Docket Number/s: 23-423, 24-283, 23-425. In the Matter of: Site Permit for a Solar Energy Generating System, Battery Energy Storage System, and 0.5-mile 115 kV Transmission Line. Follow This Issue: Search eDockets. Subscribe to eDockets.
Friday, September 12, 2025, 4:30 PM.
For more info visit mn.gov.