1160157-013-Fan Shutdown-(T-Wing) 09-29-26, 7:30AM To 10:00AM

Event:  Please notify affected occupants of a shutdown of T WING fans (SF4/TWX-0-02-12).   Serving the following areas: South Central T-Wing all floors (including Auditoriums & Excluding the Vivarium).  While the areas served vary slightly from floor to floor the yellow shaded areas of the map below more or less represent the area of the shutdown.   Time:  09-29-26, 7:30AM To 10:00AM (2.5 Hours)   Reason:  Filter Change   Effect: The affected area will not have HVAC Heating/Cooling. The area may become stuffy due to lack of supply air circulation. Hallways may seem breezy due to air pressure imbalance.  There may be variations in temperature. Fume hoods or biological safety cabinets should not be used during the shutdown, please refer to this EH&S link for information: Fume Hoods | UW Environmental Health & Safety,   Special Note 1: Though fume hood(s) or biological safety cabinet(s) may appear to operate, they should be considered not ready for normal use and ”Low-Flow Alarms” may occur during the… Event interval: Single day event. Accessibility Contact: hsbuild@uw.edu. Event Types: Not Specified. Tuesday, September 29, 2026, 7:30 AM – 10:00 AM.

Abatement 34435 Scheduled

Regulated Materials work order 34435, 1133126 HSB-BB-Wing BB821, 825, 829 and 839, has been scheduled for the nights of Tuesday, September 29, 2026 through Wednesday, September 30, 2026.    "Health Sciences Zone -Abatement request- Demo carpet, cove base and any loose VCT in BB821, 825, 829 and 839". Event interval: Single day event. Accessibility Contact: hsbuild@uw.edu. Event Types: Not Specified. Tuesday, September 29, 2026, 12:00 PM – Wednesday, September 30, 2026, 1:00 PM.

RMO 34447

Regulated Materials work order 34447, 1164073 HSB-T-Wing T353, has been scheduled for the nights of Thursday, October 1, 2026 AND Monday, October 5, 2026.  (See below for scope of work.)   Scope of Work: "Health Sciences Zone - Renovations ESTIMATE APPROVED!! T353 ceiling check. I need to do some work in the ceiling where it was recently remodeled by Skanska. The client says it was permanently abated but I would like confirmation if possible.". Event interval: Single day event. Accessibility Contact: hsbuild@uw.edu. Event Types: Not Specified. Thursday, October 1, 2026.

1160157-014-Fan Shutdown-(T-Wing) 10-01-26, 7:30AM To 10:00AM

Event:  Please notify affected occupants of a shutdown of T-wing fans (TWX-0-02-10).   Serving the following areas: T Wing (Central), 1st to 6th floors (Does not affect Vivarium).  While the areas served vary slightly from floor to floor the orange shaded areas of the map below more or less represent the area of the shutdown. , Time:  10-01-26, 7:30AM To 10:00AM (2.5 Hours)   Reason:  Filter Change   Effect: The affected area will not have HVAC Heating/Cooling. The area may become stuffy due to lack of supply air circulation. Hallways may seem breezy due to air pressure imbalance.  There may be variations in temperature. Fume hoods or biological safety cabinets should not be used during the shutdown, please refer to this EH&S link for information: Fume Hoods | UW Environmental Health & Safety,   Special Note 1: Though fume hood(s) or biological safety cabinet(s) may appear to operate, they should be considered not ready for normal use and ”Low-Flow Alarms” may occur during the maintenance work as outlined… Event interval: Single day event. Accessibility Contact: hsbuild@uw.edu. Event Types: Not Specified. Thursday, October 1, 2026, 7:30 AM – 10:00 AM.

1180147--002 Columbia & J-wing Lift Stations Shutdown (I, I-Court, J and K Wings, all floors), 10-03-26 from 6:00AM to 5:00PM

Event:  Please notify affected occupants that the Columbia & J-wing Lift Stations serving the following areas will be shutdown:   * I Wing All Floors    * I Court Floors -2, -1, and 1   * K Wing All Floors    * J Wing All floors. (Vivarium Areas Affected).   Time:  10-03-26 from 6:00AM to 5:00PM (Duration 11 hours)   Reason:  Annual Preventative Maintenance.   Effect: All utilities listed below will be OFF. Lab and potable water (hot and cold), Steam to sterilizers and washers, RO water (limited RO water will be available until storage tanks are empty), All water cooled systems will not be operational until the water system is returned to normal service. I Wing Room 104 Cold-room (will lose city water by-pass),   Occupants are advised to have any sensitive equipment/experiments on standby, hold or off to avoid any issues during utility outage.   Special Note 1: To guard against accidental flooding, all affected Water Faucets must remain in the off position for the duration of the shutdown.  If there is no… Event interval: Single day event. Accessibility Contact: hsbuild@uw.edu. Event Types: Not Specified. Saturday, October 3, 2026, 6:00 AM – 5:00 PM.

RMO 34447

Regulated Materials work order 34447, 1164073 HSB-T-Wing T353, has been scheduled for the nights of Thursday, October 1, 2026 AND Monday, October 5, 2026.  (See below for scope of work.)   Scope of Work: "Health Sciences Zone - Renovations ESTIMATE APPROVED!! T353 ceiling check. I need to do some work in the ceiling where it was recently remodeled by Skanska. The client says it was permanently abated but I would like confirmation if possible.". Event interval: Single day event. Accessibility Contact: hsbuild@uw.edu. Event Types: Not Specified. Monday, October 5, 2026.

WO 1172940-003 Fan Shutdown (Foege Bioengineering) 10-06-26 7:30AM to 11:00AM

Event: AHU 1 N Shutdown at Foege Bio affecting Air Circulation   Serving the following areas: Labs on all floors.   Time: 10-06-26 7:30AM to 11:00AM (Duration 3.5 hours)   Reason: Preventative Maintenance.   Effect:The affected area will not have HVAC Heating/Cooling. The area may become stuffy due to lack of supply air circulation. Hallways may seem breezy due to air pressure imbalance. There may be variations in temperature. Fume hoods or biological safety cabinets should not be used during the shutdown, please refer to this EH&S link for information: Fume Hoods | UW Environmental Health & Safety,   Special Note 1: Though fume hood(s) or biological safety cabinet(s) may appear to operate, they should be considered not ready for normal use and ”Low-Flow Alarms” may occur during the maintenance work as outlined in this notice.   Special Note 2: If any equipment, systems or utilities are not back in normal order after any scheduled shutdown building occupants should immediately contact FS Customer Care… Event interval: Single day event. Campus location: William H. Foege Bioengineering (BIOE). Accessibility Contact: hsbuild@uw.edu. Event Types: Not Specified. Tuesday, October 6, 2026, 7:30 AM – 11:00 AM.

HSEB October 13th Fire Sequence Testing

University Facilities will be conducting tests during the dates/times indicated below. We need ACCESS TO ALL ROOMS THAT HAVE FIRE ALARM DEVICES located in them. We will assume that access is granted in ALL AREAS. If you have security and/or safety issues which need to be addressed, please provide us with ample notice in advance prior to the test to resolve the issue. The fire alarm horns/speakers will sound sometime during the times listed below for the approximate number of minutes shown. As indicated by (*), other building equipment may be affected by this test.   NO BUILDING EVACUATION IS REQUIRED.   Johnny Smith (South Fire Control Tech Lead) is coordinating this work activity and responsible for the building tests listed below in italics, If you have concerns or questions regarding these tests, please contact him at 685-1471.   NOTE: Fred Ryun (North Fire Control Tech Lead) is responsible for the building tests listed below, and may be contacted at 685-1471 should you have questions or concerns relating… Event interval: Single day event. Accessibility Contact: hsbuild@uw.edu. Event Types: Not Specified. Tuesday, October 13, 2026, 6:30 AM – 7:30 AM.